Engineering
  • Home
  • Building Design & Construction
  • Construction Inspections
    • Sidewalks
  • Roadway & Stormwater Design
    • Civil Design and Stormwater Design Standard Drawings
    • Stormwater Drainage Masterplan Studies
    • Floodplain Management
    • Memphis/Shelby County Stormwater Management Manual (SWMM)
    • Urban Transportation Planning Grant
  • Land Development
  • Mapping & Central Property Records
  • Sewer Design
  • Signs & Markings
  • Traffic Engineering Office
    • Parking Meters
    • Speed Humps
    • Speed Safety Cameras
  • Traffic Signal Maintenance
  • Transportation Planning Office
    • Prevailing Wage
  • Documents
  • FAQs
Select Page
MemphisTN.gov

ridgeway basin

Ridgeway Drainage Basin Study – Volume 1 & 2

    • Part 1 of 1 – Link 

 

 

 

 

List of Studies

 

  • Allen Basin
  • Black Bayou
  • Campbell
  • Cane Creek
  • Cherry Bayou
  • Cotton
  • Cypress Creek
  • Days Creek
  • Fletcher Creek
  • Forrest Lake
  • Gayoso Bayou (Northern Portion)
  • Harrington Creek
  • Harrison Creek
  • Horn Lake
  • Huling Interceptor
  • Hurricane Creek
  • Johns Creek
  • Kirby
  • Lick Creek
  • Madison Heights
  • Mallory
  • Marble
  • North Wolf River
  • Point Church Basin
  • Raleigh Basin
  • Ridgeway Basin
  • South Cypress Creek
  • Southland Basin
  • Sweetbriar Creek
  • Ten Mile Bayou
  • Todd Creek
  • Walnut Grove Lake Basin
  • White Station Creek
  • Whitehaven Creek
  • Windermere Basin
  • Workhouse

Memphis SQ2 Program

These studies are part of the Memphis SQ2 Stormwater/Drainage Improvement Program. Click here for more information about this program.

Popular Topics



Pedestrian Projects



Bikeway Map



Sidewalks



Paving Schedule



Waze



Memphis SQ2



Truck Routes & Bridge Specifications



Speed Humps

u

FAQ



Road Closures, Blockages & Detours

=

Develop 901



Elvis Presley Boulevard Improvement Project



Public Art Oversight Committee