ridgeway drainage basin

The Ridgeway study area roughly corresponds to the area bounded by Poplar Avenue on the north, South Germantown Road on the east, Stout Road and the Nonconnah River on the south, and South White Station Road on the west. 

(click here for an interactive map)

Study completed: 2021

Completed Project: N/A

Planned Project: To Be Announced

Ridgeway Drainage Basin Study – Volume 1

Ridgeway Drainage Basin Study – Volume 2

 

 

 

 

Memphis SQ2 Program

These studies are part of the Memphis SQ2 Stormwater/Drainage Improvement Program. Click here for more information about this program.