gayoso bayou Drainage basin
The Gayoso Bayou study area roughly corresponds to the area bounded by Bickford Avenue on the north, a diagonal line from Chelsea Avenue to Central Avenue and South Belvedere Boulevard on the east, the Union Pacific Railyard on the south, and a diagonal line from Central Avenue up to Union Avenue, then following along Union Avenue, then along Wolf River Lagoon on the west.
(click here for an interactive map)
Study completed: 2022
Completed Project: N/A
Planned Project: To Be Announced
Gayoso Bayou Drainage Basin Study – Volume 1
-
- Part 1 of 1 – Download
Gayoso Bayou Drainage Basin Study – Volume 2
-
- Part 1 of 1 – Download
List of Studies
- Allen Basin
- Black Bayou
- Campbell
- Cane Creek
- Cherry Bayou
- Cotton
- Cypress Creek
- Days Creek
- Fletcher Creek
- Forrest Lake
- Gayoso Bayou (Northern Portion)
- Harrington Creek
- Harrison Creek
- Horn Lake
- Huling Interceptor
- Hurricane Creek
- Johns Creek
- Kirby
- Lick Creek
- Madison Heights
- Mallory
- Marble
- North Wolf River
- Point Church Basin
- Raleigh Basin
- Ridgeway Basin
- South Cypress Creek
- Southland Basin
- Sweetbriar Creek
- Ten Mile Bayou
- Todd Creek
- Walnut Grove Lake Basin
- White Station Creek
- Whitehaven Creek
- Windermere Basin
- Workhouse
Memphis SQ2 Program
These studies are part of the Memphis SQ2 Stormwater/Drainage Improvement Program. Click here for more information about this program.